WC1 · Cleaners

Primary Scraper Cleaner

一级刮板清扫器

A primary belt cleaner with a segmented blade that removes the bulk of carry-back, copes with belt joins and lets you replace one worn segment instead of the whole assembly.

Primary Scraper Cleaner
  • SKU prefixCLEANERS-WC1
  • MOQ10 pcs
  • Lead time1 month
  • StandardWC1

Configure & add to inquiry cart

Choose the specs for your application. We will reply with pricing, FOB and lead time for your selection.

Current SKU: CLEANERS-WC1

Overview

Primary Scraper Cleaner at a Glance

500–1800 mmBelt width
WC / WCPBlade
DTII / TD75 / ISOStandard
ISO 9001 / MACertified · WC1

Usage

Usage

Primary Scraper Cleaner — a 1st-stage scraper mounted tight against the belt at the discharge (head) pulley. It removes the bulk of carryback — wet fines, clay and slurry — the instant material leaves the pulley; this single stage is the most important for keeping the return run clean and is fitted on every loaded conveyor.

Operating conditions

Operating conditions

Working temperaturePU blades -40 °C to +80 °C; ceramic-tipped blades up to +500 °C — confirm per model.
Dusty environmentSuitable — PU or ceramic blades are unaffected by dust; no bearings to contaminate
Moisture & waterSuitable — PU blades and coated steel bodies take washdown; stainless for continuous wet duty
Corrosive environmentStainless blade holders available — powder-coated steel for ordinary acid or alkali, stainless for high-salinity sites
CertificationMA coal-mine safety certified versions available — confirm the certified SKUs for your project
Outdoor useSuitable — coated and stainless options for coastal and weathering service

Technical overview

Belt cleaners scrape carryback off the return strand so material does not build up on pulleys, idlers and structure. HBXM offers primary and secondary cleaners with polyurethane or tungsten blades rated for wet, sticky and abrasive ores.

Why is a belt cleaner important?

Without cleaning, carryback wears pulleys and idlers, causes mistracking and creates housekeeping and safety hazards under the conveyor.

Primary vs secondary cleaner: which do I need?

Use a primary cleaner at the head pulley for bulk carryback, then a secondary cleaner downstream for the fine residual layer.

Which blade material lasts longest?

Polyurethane suits most dry and medium-abrasive ores; tungsten or ceramic-tipped blades are best for very hard, wet and sticky materials.

Can cleaners be retrofitted to an existing conveyor?

Yes. Our cleaners mount to standard stringer widths with adjustable tension and fit most head-pulley arrangements without conveyor modification.

Highlights

Features

Belt-width coverage

Covers belt widths 500–1800 mm across standard conveyor sections.

Blade material

Blades in WC / WCP for a clean wipe and belt care.

Self-adjusting tensioners

Spring / torque-arm tensioners keep blade contact uniform as the blade wears.

Polyurethane blade

PU compound Shore 85–95 A wipes carryback while staying gentle on the belt.

Modular mounting

Adjustable brackets fit B500–B2400 widths and head-pulley layouts.

Quick blade swap

Cartridges swap without removing the frame, cutting downtime.

Quality

1

Blade integrity

One-piece polyurethane blade cast to consistent Shore hardness for a clean wipe.

2

Tensioner reliability

Dual self-adjusting springs hold constant contact across the blade life.

3

Frame strength

Welded beam load-tested for pulley-side installation.

4

Finish options

Epoxy / powder coat or full stainless for port and coastal duty.

FAQ

Frequently asked questions

How many segments do I need?

Enough to cover the belt width with a small gap between them — typically 4–8 segments on a 1000 mm belt. The gaps let each segment follow the belt independently.

What blade material suits my material?

Polyurethane for medium abrasion and a belt cover you want to protect; tungsten carbide for sinter, coke and high-abrasion ore where blade life is the priority.

How do I tension a segmented cleaner?

Set the springs to the manufacturer's datum, run the conveyor loaded for one shift, then re-check. Spring tension should be re-verified at every planned inspection.